Close

    Administrative Setup

    • Technical Structure of Rural Construction Department
      • Chief Engineer, Level-1 (Department Head) State Level
        • Superintending Engineer (Circuit Dehradun)
          • Division – Dehradun
          • Division – Haridwar
          • Division – Uttarkashi
          • Division – Tehri
          • Division – Ghansali
        • Superintending Engineer (Circuit Pauri)
          • Division – Pauri
          • Division – Kotdwar
          • Division – Rudraprayag
          • Division – Chamoli
        • Superintending Engineer (Physical) 1
        • Executive Engineer (Headquarters) – 2
        • Chief Engineer, Level-2 (Kumaon) – 1
          • Superintending Engineer (Circuit Nainital)
            • Division – Nainital
            • Division – Udham Singh Nagar
            • Division – Almora
            • Division – Bhikiyasain
          • Superintending Engineer (Circuit Pithoragarh)
            • Division – Pithoragarh
            • Division – Champawat
            • Division – Bageshwar
            • Division – Didihat
        • Executive Engineer (Civil – 22)
        • Assistant Engineer (Civil – 84)
        • Executive Engineer (Electrical – 01)
        • Assistant Engineer (Mech./Elect. – 05)
        • Junior Engineer / Assistant Engineer (Mech./Elect. – 20)
        • Junior Engineer / Assistant Engineer (Civil – 302)
        • Total number of divisions in the department – 17
        • In addition to the above, three divisions – Karnaprayag, Kapkot (Bageshwar), and Didihat (Pithoragarh) – have been dedicated to PMGSY.

    Technical Structure of Rural Construction Department